Lake Level BlogUncategorized

February 24, 2018 Flood Monitoring Update

By February 24, 2018

TRWD flood monitoring staff continues to monitor reservoir conditions 24 hours a day.  The latest update of the conditions at the District reservoirs is as follows:

  • Lake Bridgeport and Richland-Chambers are not expected to reach conservation level at this time
  • Eagle Mountain Lake is expected to surpass conservation level later today.  This will engage the uncontrolled service spillway for a low level discharge (<500 cfs).  The reservoir level will continue to be monitored and controlled releases will be made as necessary to maintain a safe operating level.
  • Cedar Creek is above conservation and controlled flood discharges have begun.

Please call the Flood Hotline for further information.

817-720-4296.

If prompted to leave a message, the flood monitor on duty will return your call within 30 minutes

Lake Current Level Conservation Level* Level Difference**
Arlington 550.75 550.00 0.75
Benbrook 698.33 694.00 4.33
Bridgeport 822.59 836.00 -13.41
Cedar Creek 322.15 322.00 0.15
Eagle Mountain 647.62 649.10 -1.48
Lake Worth 591.98 594.00 -2.02
Richland-Chambers 315.72 315.00 0.72
*Conservation Level: The permitted level of water an entity is allowed to hold in a lake. Any amount above the conservation level is used for the temporary storage of flood waters and must be released downstream.
**Difference: Amount above or below conservation level.
For more information read our daily reports or the TRWD Lake Level Blog.

Check out the TRWD OneRain portal for a visualization of this information and more.

Stay connected with TRWD!

Sign up for our newsletter!

Newsletter Sign Up