Phase 1 overview:

Construction Progress is subject to changes due to weather and schedule. New or updated items are indicated in bold.

August – December

  • Mansfield Tunnels
    • Walnut Creek Drive: Daily Apr 6-Sept 18 Tunneling & install Casing.
    • Broad Street: Daily Sept 21 – Oct 23 Tunneling & install Casing.
    • Between Hobby Lobby parking lot and 287 access road: Daily Oct 26 – Nov 20 Tunneling & install Casing.
    • US287: Daily Aug 17 – Nov 22 Removal of concrete pipe within existing US287 casing.
    • US287: Daily Nov 23 – Dec 18 Install new Steel Pipe within existing US287 casing.
    • Walnut Creek: Daily Aug 17 – Sept 21 Tunneling & install Casing.
  • UPRR Tunnel Mansfield
    • Daily Sept 21 – Nov 23: Removal of concrete pipe within existing UPRR casing.
    • Daily Nov 23 – Dec 15: Install new Steel Pipe within existing UPRR casing.

Surface and stream restoration Mouser Way to Walnut Ridge Drive.

Lake Current Level Conservation Level* Level Difference**

Want to add Lake Levels to your home screen? Click here to learn how

*Conservation Level: The permitted level of water an entity is allowed to hold in a lake. Any amount above the conservation level is used for the temporary storage of flood waters and must be released downstream.

**Difference: Amount above or below conservation level.

Stay connected with TRWD!

Sign up for our newsletter!

Newsletter Sign Up