Uncategorized

IPL Project named Envision’s first platinum-awarded pipeline

By July 19, 2016
TRWD Award

The Integrated Pipeline Project (IPL), a 150-mile long water transmission system being built by two North Texas water suppliers, has received the Institute for Sustainable Infrastructure’s (ISI) Envision Platinum Award. The Tarrant Regional Water District (TRWD) and the City of Dallas were presented Envision’s highest level of achievement award by ISI President Bill Bertera during TRWD’s July 19, 2016 Board meeting.

The IPL project is the 14th project in North America, and the first Platinum-awarded pipeline, to receive an ISI Envision rating award. The ISI Envision system measures sustainability in infrastructure projects in five categories: Quality of Life, Leadership, Natural World, Resource Allocation and Climate and Risk. These contribute to overall credits for the positive social, economic and environmental impacts in a community in the planning, design and construction of infrastructure projects.

“This project represents the first regional water supply partnership of this scale in Texas, and goes beyond cooperation to planning, implementation and sharing of assets,” said ISI President and CEO, Bill Bertera. “Their leadership in these sustainable areas sets a high level of infrastructure precedence and so is well deserving of the Platinum award level.”

The pipeline, which will help meet water demands in rapidly growing Tarrant, Dallas and surrounding counties, extends from Lake Palestine in East Texas to Lake Benbrook just south of Fort Worth. By sharing resources, TRWD and the City of Dallas will save an estimated $500 million in capital expenses and potentially more than $1 billion over the life of the project.

“We are very pleased that the Integrated Pipeline Project has received this Platinum recognition from the ISI,” said Rachel Ickert, TRWD’s water resources engineering director. “Sustainability is a mindset. It’s who we are and how we approach projects and operations. It’s about doing the right projects and doing them the right way considering life-cycle costs, the communities we serve, and the environment.”

The IPL Envision assessment was completed in cooperation with Elizabeth Blackwelder of Freese and Nichols, Inc. and Nathan D. Maier Consulting Engineers, Inc.

For more information, contact info@trwd.com.

Lake Current Level Conservation Level* Level Difference**
Arlington 543.67 550.00 -6.33
Benbrook 691.04 694.00 -2.96
Bridgeport 824.04 836.00 -11.96
Cedar Creek 319.44 322.00 -2.56
Eagle Mountain 643.21 649.10 -5.89
Lake Worth 591.28 594.00 -2.72
Richland-Chambers 313.63 315.00 -1.37
*Conservation Level: The permitted level of water an entity is allowed to hold in a lake. Any amount above the conservation level is used for the temporary storage of flood waters and must be released downstream.
**Difference: Amount above or below conservation level.
For more information read our daily reports or the TRWD Lake Level Blog.

Check out the TRWD OneRain portal for a visualization of this information and more.

Stay connected with TRWD!

Sign up for our newsletter!

Newsletter Sign Up