Uncategorized

Trail Detour by Shannon’s Point Trailhead

By November 26, 2019

Across the river from Shannon’s Point Trailhead, there will be a small detour in our efforts to improve a patch of concrete trail. You can expect construction to begin around early December. If you have any questions, please use the Connect tab in the mobile app or submit a contact inquiry on the Trinity Trails of Fort Worth website.

Update: The detour trail will be coming up the ramp from Overton Dam. The reroute will begin on December 4, 2019. Be careful to slow down to make a sharp turn at the detour.

Lake Current Level Conservation Level* Level Difference**
Arlington 550.87 550.00 0.87
Benbrook 698.00 694.00 4.00
Bridgeport 822.41 836.00 -13.59
Cedar Creek 322.22 322.00 0.22
Eagle Mountain 647.12 649.10 -1.98
Lake Worth 591.92 594.00 -2.08
Richland-Chambers 315.87 315.00 0.87
*Conservation Level: The permitted level of water an entity is allowed to hold in a lake. Any amount above the conservation level is used for the temporary storage of flood waters and must be released downstream.
**Difference: Amount above or below conservation level.
For more information read our daily reports or the TRWD Lake Level Blog.

Check out the TRWD OneRain portal for a visualization of this information and more.

Stay connected with TRWD!

Sign up for our newsletter!

Newsletter Sign Up