Uncategorized

Potential reroute in Coyote Theater area

By July 19, 2019

There will be a possible reroute from mile marker WF 2480 and WF 2510 near the Coyote Theater area off the trail system due to construction. Please be aware there will be an increase in truck traffic in this area. Construction is planned to begin in early August.

Lake Current Level Conservation Level* Level Difference**
Arlington 550.54 550.00 0.54
Benbrook 694.32 694.00 0.32
Bridgeport 821.64 836.00 -14.36
Cedar Creek 322.35 322.00 0.35
Eagle Mountain 645.25 649.10 -3.85
Lake Worth 591.21 594.00 -2.79
Richland-Chambers 315.31 315.00 0.31
*Conservation Level: The permitted level of water an entity is allowed to hold in a lake. Any amount above the conservation level is used for the temporary storage of flood waters and must be released downstream.
**Difference: Amount above or below conservation level.
For more information read our daily reports or the TRWD Lake Level Blog.

Check out the TRWD OneRain portal for a visualization of this information and more.

Stay connected with TRWD!

Sign up for our newsletter!

Newsletter Sign Up